Preliminary Report-Full report later.
Situation on September 26 2005.
Build near the end of August 1944, this
planned V1 launch site was never operational.
Only a concrete road and a launch support
structure is still visible.
German left over of the concrete road.
Launch plate and first concrete support block.
Launch direction: Compass measurement is 282°
Distance between each pair of blocks is about 5m.